Feb 2016 – Present Employment Duration2 yrs 3 mos Greater Jakarta Area, Indonesia As a project consultant, I am assigned to several tas...
Medco E&P Indonesia, Senior Project Management Consultant
Greater Jakarta Area, Indonesia
As a project consultant, I am assigned to several tasks in Block A Gas Development Project in Aceh Timur and have responsibilities that include but not limited to:
(1) Coordinating the EPC (engineering, procurement, and construction) of gas flowlines and pipelines project
(2) Coordinating logistics and traffic management.
(3) Coordinating SIMOPS (Simultaneous Operations) management
(4) Coordinating pre-commissioning preservation program for Central Processing Plant
(3) Interfacing among drilling, construction, commissioning, and operations.
Nov 2015 – Present Employment Duration2 yrs 6 mos Greater Jakarta Area, Indonesia As a president director, I have the highest responsib...
PT Telaga Cipta Indonesia, CEO / President Director
Greater Jakarta Area, Indonesia
As a president director, I have the highest responsibility for managing the company and conduct several projects, includes but not limited to:
(1) Setting-up a new investment capital project.
(2) Upgrading the existing capital asset or infrastructure.
(3) Business strategic planning, implementation, and control.
(4) Providing project management consultancy based on the international project management guides and standards (PMI-PMBOK series).
(5) Teaching project management training based on international project management standards (PMI-PMBOK 5th Edition)
(6) Teaching technical writing and the project documents handling.
(7) Inspiring and helping others to succeed - especially in project management and entrepreneurship
Jan 2013 – Oct 2015 Employment Duration2 yrs 10 mos Jakarta - Bula (Maluku) As an operations manager, I had full responsibility for ope...
Kalrez Petroleum (Seram) LTD, Operations Manager
Jakarta - Bula (Maluku)
As an operations manager, I had full responsibility for operations and projects, includes but not limited to:
(1) Managing multi-projects and portfolio of oil and gas brownfield: including drilling, workovers, well services, geosciences, reservoir engineering. production engineering, facilities engineering.
(2) Managing oil and gas operations; including production gathering, oil lifting, utility operations, maintenance, safety& environment, as well as supporting operations.
(3) Managing integration project and operations management, with other management (supply-chain management, HR management, and financial management).
(4) Optimizing productions with very limited resources and various reservoir problems.
(5) Applying Indonesia's Production Sharing Contract (PSC) scheme in preparing Work Program & Budget (WP&B), Authorization for Expenditure (AFE), and Financial Quarterly Report (FQR).
(6) Applying Indonesia's SKKMIGAS system in procurement.
(7) Complying with laws, rules, and recognized best of practice or standards
Jan 2006 – Dec 2012 Employment Duration7 yrs Jakarta - Bula (Maluku) As a facilities engineering lead, I got involved in hundreds of pr...
Kalrez Petroleum (Seram) Ltd., Facilities Engineering Lead
Jakarta - Bula (Maluku)
As a facilities engineering lead, I got involved in hundreds of projects and had responsibilities that include but not limited to:
(1) Managing engineering & construction projects of oil and gas facilities and infrastructure--including well's surface facilities, oil storages, gathering stations, block stations, oil-gas-water separators, building, jetty, flowline & pipeline, power generators -- as well as operating troubleshooting.
(2) Managing integration of design, construction, and maintenance to make sure facilities availability, maintainability, and reliability, to minimize unplanned shutdown.
(3) Preparing conceptual design, FEED, detailed design.
(4) Preparing project requirement and specification.
(5) Planning and controlling project time schedule, cost, risk, and quality.
(6) Applying national or international standard in design (ISO, SNI, ANSI, API, ASME, NACE, etc.).
(7) Applying Indonesia"s PSC system in budgeting and cost estimating (WP&B) and project proposal (AFE)
(8) Complying laws, rules and recognized best of practice.
Jan 2005 – Dec 2005 Employment Duration12 mos Jakarta - Baturaja (South Sumatera) As a construction superintendent, I had responsibilit...
PT. Cahaya Batu Raja Block (CBRB), Construction Superintendent
Jakarta - Baturaja (South Sumatera)
As a construction superintendent, I had responsibilities that include but not limited to:
(1) Managing construction projects of oil and gas infrastructure and facilities--including well's surface facilities, oil storages, block stations, oil-gas-water separators, compressor stations, water injection stations, building, yard, road, flowline & pipeline -- as well as operating troubleshooting.
(2) Managing integration of design, construction, and maintenance.
(3) Preparing conceptual design, FEED, detailed design.
(4) Preparing project requirement and specification.
(5) Planning and controlling project time schedule, cost, and quality.
(6) Applying national or international standard in construction and installation (SNI, ANSI, API, ASME, NACE, etc.).
(7) Applying PERTAMINA's Joint Operating Body system in budgeting (WP&B) and project proposal (AFE)
(8) Complying laws, rules, and recognized best of practice.
Jul 1997 – Dec 2004 Employment Duration7 yrs 6 mos Jakarta - Prabumulih (South Sumatera) As a facilities engineer, I had responsibiliti...
Seaunion Energy, LTD, Sr. Facilities Engineer
Jakarta - Prabumulih (South Sumatera)
As a facilities engineer, I had responsibilities that include but not limited to:
(1) Managing engineering & construction projects of oil and gas infrastructure and facilities--including but not limited to well's surface facilities, oil storages, block stations, oil-gas-water separators, compressor stations, water injection stations, building, flowline & pipeline -- as well as operating troubleshooting.
(2) Managing integration of design, construction, and maintenance.
(3) Applying national or international standard in design (SNI, ANSI, API, ASME, NASE, etc.).
(4) Applying Indonesia's JOB system in financial budgeting (WP&B and AFE)
(5) Fulfilling all requirements of rules and recognized best of practice.
Jul 1991 – Jun 1997 Employment Duration6 yrs Jakarta - Prabumulih (South Sumatera) As a construction engineer, I had responsibilities t...
Husky Energy, Construction Engineer
Jakarta - Prabumulih (South Sumatera)
As a construction engineer, I had responsibilities that include but not limited to:
(1) Supervising construction projects of oil and gas infrastructure and facilities--including well's surface facilities, oil storages, block stations, oil-gas-water separators, compressor stations, water injection stations, building, warehouse, yard, road, flowline & pipeline -- as well as operating troubleshooting.
(2) Planning and controlling schedule, cost, and quality
(3) Applying national or international standard in construction and installation (SNI, ANSI, API, ASME, NACE, etc.).
(4) Applying PERTAMINA's Joint Operating Body system in budgeting (WP&B) and project proposal (AFE)
(5) Complying laws, rules, and recognized best of practice.