PT. Ceria Utama Abadi, Piping-Pipeline Engineer

Dec 1988 – Jun 1990  Employment Duration1 yr 7 mos

Jakarta - Balik Papan - Cilegon - Merak

As a piping-pipeline engineer, I had responsibilities that include but not limited to:

(1) Preparing bid proposal and cost estimate for several tenders for oil companies.

(2) Planning project requirement and specification.

(3) Planning project schedule.

(4) Leading mechanical drafting team as well as drafting by myself.

(5) Using AutoCAD

(6) The detailed designing oil metering system at depot facilities of Pertamina, in Cilacap.

(7) Supervising gas pipelines construction (including start-up and commissioning) of Perusahaan Gas Negara, in Jakarta and Tangerang.

(8) Supervising carbon black plant construction of PT. Carbon Black Indonesia, in Merak.

(9) The detailed designing air conditioner of Huffco Indonesia's office in Balik Papan.

(10) Applying international standard for process piping (ANSI B31.3), pipeline (ANSI B31.8) and pressure vessel (ASME BPV Sect VIII)