Jan 2005 – Dec 2005 Employment Duration12 mos
Jakarta - Baturaja (South Sumatera)
As a construction superintendent, I had responsibilities that include but not limited to:
(1) Managing construction projects of oil and gas infrastructure and facilities--including well's surface facilities, oil storages, block stations, oil-gas-water separators, compressor stations, water injection stations, building, yard, road, flowline & pipeline -- as well as operating troubleshooting.
(2) Managing integration of design, construction, and maintenance.
(3) Preparing conceptual design, FEED, detailed design.
(4) Preparing project requirement and specification.
(5) Planning and controlling project time schedule, cost, and quality.
(6) Applying national or international standard in construction and installation (SNI, ANSI, API, ASME, NACE, etc.).
(7) Applying PERTAMINA's Joint Operating Body system in budgeting (WP&B) and project proposal (AFE)
(8) Complying laws, rules, and recognized best of practice.
Jan 2005 – Dec 2005 Employment Duration12 mos Jakarta - Baturaja (South Sumatera) As a construction superintendent, I had responsibilit...
PT. Cahaya Batu Raja Block (CBRB), Construction Superintendent
About author: Jufran Helmi
Cress arugula peanut tigernut wattle seed kombu parsnip. Lotus root mung bean arugula tigernut horseradish endive yarrow gourd. Radicchio cress avocado garlic quandong collard greens.
Subscribe to:
Post Comments (Atom)
0 comments: